Recently research and guidance has been produced regarding children’s play with two main sources of information: Fields in Trust (FIT), formally NPFA, and Play England. Play England provides advice on the quality of the play space and the philosophy of children’s play, whilst FIT continues to provide quantitative advice on the type and number of provision. New FIT guidelines were introduced in August 2008 to update ‘The Six Acre Standard’. These new guidelines are entitled Planning and Design for Outdoor Sport and Play’ (PAD). The following points are of particular relevance for residential developments:
- Play areas no longer have to provide a set number of pieces of equipment, but rather play experiences, for example, a LEAP has to provide a minimum of six experiences and a NEAP has to provide a minimum of nine play experiences. Therefore a scheme could theoretically be achieved without equipment.
- For higher density developments, particularly ‘brownfield’ sites, the play area buffer zone may be reduced around LEAPs which could result in a reduction from 3600m2 to 1600m2 and a consequently larger developable area.
- You no longer need to enclose a play area within a fence, only if the play area abuts a road, water course or other hazard.
- Local Landscaped Area for Play is a new designation that sits between a LEAP and a NEAP. Fundamentally this is an unequipped space that is specifically laid out to encourage imaginative play for all ages.
- The methodology of assessing existing play spaces has changed and is now based on a points system which will conclude if the local provision is of a high quality and experience.
For more information please read on…
Recently, research has been undertaken into how children use play spaces and how we can improve their play areas by providing stimulating and challenging experiences. Historically, the National Playing Fields Association (NPFA) provided this advice, and was established to set benchmark standards to outline and protect the amount of designated open space, play and sports facilities close to where people live. More recently, Play England, part of the National Children’s Bureau, has become the forerunner in the philosophy of children’s play.
The NPFA produced ‘The Six Acre Standard’ originally in the 1930’s to ensure that everyone had access to play and sports facilities close to where they live. These standards were then adopted by Local Planning Authorities and incorporated into their planning policies and planning conditions for development sites. The NPFA then re-branded themselves as the Fields in Trust (FIT) and produced the updated version of their guidelines, entitled: ‘Planning and Design for Outdoor Sport and Play’ (PAD). These new guidelines advise on the latest legislation and public policy and also provide advice on climate change, SUDS and sustainable communities.
PAD has similar principles to The Six Acre Standards, with a few main changes:
- Play criteria of Local Equipped Area for Play (LEAP) and Neighbourhood Equipped Area for Play (NEAP) • Means of enclosing a play area
- Introduction of the newly created ‘Local Landscaped Area for Play’
- Methodology of auditing existing play spaces
LEAPs are to be designed and laid out specifically for children who are beginning to go out and play independently and has a minimum activity zone of 400m². The main change to the play criteria is that the area is to provide play experiences (rather than a set number of pieces of equipment). The space is therefore to be designed to provide a stimulating and challenging play experience and PAD recommends that a minimum of six play experiences (from their list) are to be provided. The play area should also have a buffer zone of at least 20m in depth which contains varied planting, giving an overall area of 3600m². It is worthy of note that, for higher density developments, particularly Brownfield Sites, the play area buffer zone may be reduced under the new guidleines.
NEAPs are to be designed and laid out specifically for older children and have a minimum activity area of 1000m², with 465m² of the area laid out for a kick-about area. Like the LEAP, the main change to the play criteria is that the area is to provide play experiences (rather than a set number of pieces of equipment). The space is therefore to be designed to provide stimulating and challenging play experiences and PAD recommends that a minimum of nine play experiences (from their list) are to be provided, as well as bicycle parking. The play area should also have a buffer zone of at least 30m in depth, containing varied planting.
The guidelines relating to enclosure of the play area has also changed. PAD outlines that the site should be enclosed, but this is dependant upon location. If the play area is beside a road, then fencing and gates is the ideal solution. If the site is within a larger area of open space then fencing is not required and delineation of the play space can be achieved with planting or earth mounds.
A newly created designation of a Local Landscaped Area for Play is intended to be used as an alternative to a LEAP and is intended for use by children and young people alike. It is to be imaginatively landscaped to encourage play, although no play equipment has to be provided. The Local Landscaped Area for Play should have a minimum activity area of 900m² and is to provide a mix of areas for both physical activity and relative calm.
When considering a new development and the amount of provision that is required, the new PAD guidelines are not as clearly defined as those within the old Six Acre Standard. However, Play England (in association with the London Plan) has produced guidelines for new developments. This recommends that an audit of existing provision is to be undertaken and then using their formulae, will conclude the type of facilities and off-site contribution required. PAD also advises that an audit of the existing provision is of benefit and the methodology of this audit has changed within the new guidelines. The assessment is now based on a points system, where points are awarded for certain features of the existing play spaces. This will not only identify the amount of existing provision but also the quality. ACD are pleased to be able to offer these PAD compliant assessments.
FIT has confirmed that subsequent revisions to the PAD guidelines are imminent and ACD will, of course, keep the Blog updated to provide you with the most up-to-date guidance.